Two KRS dissolvers with control panels installed at a customer site

INSTALLATION

Dissolvers installed at a customer site

Category InstallationDate September 2025

KRS machines installed and commissioned at customer sites.

The photos show KRS dissolvers with their control panels installed on site, a laboratory dissolver set up on a customer workbench, and KRS engineers commissioning bead mills with the customer’s product.